Home - About CMT.com - Model Encyclopedia - Model News - Other Chinese Layouts & Models - Links



The planning for Wangkui seems to be an ongoing process, and many areas are still undecided. Most of the track has been laid as shown in the track plan below, apart from around Daqing (areas around 15, 21 & 22) and the upper lever in the center of the room.

There is a double mainline that runs around the perimeter of the room, with two main branch lines - one joins the mainline at the bottom right hand corner of the diagram below which goes downhill to Anda (3), and one that joins the mainline at the bottom left hand corner and travels uphill to Anda docks. The mainline is electrified with (dummy) overhead wires, which enable us to run our electric locomotives. It's been decided that only this line has the overhead wires to minimize possible damage from myself and other operators in case of derailments, etc.


Match the numbers below to those on the track plan:

1. Wangkui maize collective farming storage

2. Wangkui Railway station

3. Anda Railway station

4. Daqing Railway station

5. Freight locomotive depot

6. Twin viaducts

7. Anda branch line splits here and joins at (8). Outer track goes to Anda, inner loop through reversing loop for loading at the coal loading point (24)

8. Anda branch line and loop tracks, join at (7).

9. Wangkui passenger locomotive depot

10. Track goes uphill to Daqing (15)

11. Undecided industry

12. Diamond crossing

13. Daqing yards

14. Anda town center

15. Daqing city

16. Manufacturing industries

17. Yard head shunt

18. Underground loop - joins at (24)

19. Anda Colliery

20. Daqing barge loading (coal)

21. Hidden sidings

22. Daqing docks

23. Hidden siding

24. Anda coal loading point (hidden loop exit)

25. Undecided industry, possibly logs or cement

26. Operator seat

27. Dummy spur track to Suihua

Return to Wangkui Home Page
Return to previous page